找回密码
 立即注册
查看: 125|回复: 0
打印 上一主题 下一主题

no longer have

[复制链接]

3

主题

3

帖子

37

积分

新手上路

Rank: 1

积分
37
跳转到指定楼层
楼主
发表于 2014-10-15 23:01:48 | 只看该作者 回帖奖励 |倒序浏览 |阅读模式
□ chief correspondent Li Zhao correspondent Francisco for map
Zhumadian News newspaper "The children go to school across the river, no longer have? The water! Pontoon built,http://www.aurosiksha.org/login/index.php?item/create_form/1, more than two hundred meters long, it only took two days and two nights!" 29 am, business (Shangqiu) Tong (Tongbaishan ) Ruhe Road Bridge (due to the expense of the old building a new bridge was demolished) parents of children living in the neighborhood, to the newspaper reporter called again.
Ruhe providers Tong Highway Bridge, spanning four meters deep, 149 meters wide Ruhe. Middle of last month, the bridge is stripped off,http://www.makeitnatural.org/wiki/index.php?title=User:Nnh0k0odcf4k#sent_packing_to_the_elderly., the construction side but at the expense of the bridge on the river with debris hit a ridge cofferdam. Cofferdam leaving a gap of nearly three meters wide and let the water upstream from the break "through"; notch, fast-flowing, where a boatman fixed a ship iron ship. Pay a dollar, from the ship "through the" gap; do not pay the money, the water?. 27 Japanese newspaper A11 version of "although only three meters off the road surface can only sigh,http://onigdesign.com/error.html," the title of a report on the matter.
29 at noon,http://www.ard9.com/fn/bbs/home.php?mod=space&uid=8804, the reporter once again came to the scene. Broke into the scene to make eye Reporter surprise: a nearly two meters wide and over 200 meters long pontoon, appear (as shown) in the cofferdam notch.
Boardwalk Luji Sha paved on,http://small.orzweb.net/viewthread.php?tid=14386&extra=, very flat,http://www.360moto.cn/home.php?mod=space&uid=148662, viable people ride motorcycle; both sides of the fence, one meter tall, steel is "bone", blocking guard side.
29 afternoon, reporters from the construction side Bridge - Zhumadian City Sea Bridge Co. project was informed: built pontoon issue,http://www.gxbike.cn/forum.php?mod=viewthread&tid=234160&fromuid=67650,hogan olympia,http://cakaraoke.com/comments/256998.html, after Dahe reports, Zhumadian City Roads Authority attaches great importance to requirements "as soon as possible to facilitate cross-strait exchanges pontoon built."
"The end of September, the river span of 149 meters of the new bridge will be opened to traffic Ruhe; then, the pontoon will have served its purpose." Project department technician, said: During the construction period, both sides of the villagers to bring a certain amount of inconvenience; but the new bridge Ruhe put into use, will bring more convenience to travelers on both sides of the village.
(Original title: 27 Japanese newspaper reported on the 29th pontoon built)
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

j關於我們
尚未設置

Archiver|手机版|小黑屋|一起主機網  

Copyright 2013 最新最精彩-社区论坛 版权所有 All Rights Reserved.

Powered by Discuz! X3.1

© 2001-2013 Comsenz Inc.

快速回复 返回顶部 返回列表