找回密码
 立即注册
查看: 409|回复: 0
打印 上一主题 下一主题

education authorities have any argument

[复制链接]

15

主题

15

帖子

144

积分

注册会员

Rank: 2

积分
144
跳转到指定楼层
楼主
发表于 2014-9-30 23:34:17 | 只看该作者 回帖奖励 |倒序浏览 |阅读模式
Tomorrow is the Lunar round solar terms in the "snow", while the minimum temperature yesterday Suzhou City has dropped 6 ℃. Because the new school building has yet to be delivered, Suzhou City? Bridge district Fuli town Chu village primary four, five, six hundred students in grades only in makeshift tent school,http://lele8.cn/home.php?mod=space&uid=28752&do=blog&quickforward=1&id=11638, and grades one, two, three students can only be read in class B dangerous inside. In fact,christian louboutin soldes, more than two months after opening, four, five, sixth grade students had an open-air school for nearly a month, tents or classroom use now funded by the students' parents and other structures. This in the end is how it happened? Yesterday, reporters were investigated.
& Gt; & gt; & gt; parents reflect
Hundreds of students in a tent school
"School is more than two months, the child is still a tent school,woolrich parka donna, seeing the weather is getting cold, how can we not make people hurry it?" Yesterday morning,http://www.bluboo.com.cn/bbs/forum.php?mod=viewthread&tid=694818&fromuid=167408, Suzhou City? Bridge district Fuli Village, a town of Chu Liu Villagers laments. Liu Chu village children read in fourth grade,http://hexin.ctuan.cn/read.php?tid=752503&ds=1, and this year the school is housed in the old school building demolition and reconstruction, said that the implementation of the school safety project, new building Aug. 20 delivered.
Chu Zhuang Primary School is a small rural finished, a total of six grades, more than 220 students and teachers. "Because the new building is not completed, and after school four, five, six grade students only open-air school, and later set up the tent, children tent was moved to the school." Villager Shen Qinghua also worried, "this is not a long-term Total ah! "
After the beginning of winter, the weather is starting to turn cold, November 21 Suzhou City minimum temperature has dropped to 6 ℃, 23 will usher in the Lunar round solar terms, one of the "snow." People worry about kids cold body, but also for the construction of school buildings in winter to show concern. "Tianyi cold, construction will certainly be affected, no way to brush the wall, can not guarantee the quality of the project is also a problem."
& Gt; & gt; & gt; reporter visits
Teachers and students are also afraid of the cold unsafe
Yesterday afternoon, the reporter went to the Chu village primary school to see here is building a two-story classroom building, but only a few workers inside the construction. Teaching Building of the main structure has been basically completed, remove the office a total of 24 classrooms, both inside and outside the walls have not painted, nor any one classroom to install windows and doors. Shen Qinghua said that several workers is November 17 was over,hogan saldi outlet, school buildings had frequent downtime, workers have changed several dial.
New school building there is a row in front of the classroom, students are inside the school. Front row of the classroom has three tents, which also has students in class. It is understood that since the new building has yet to be delivered, school classrooms this exclusive arrangement to the grade one, two, three students, four,abercrombie pas cher en ligne, five, six hundred grade school students only in makeshift tents.
"In the tent school, started school when feeling very hot and now not only cold, very afraid, afraid to take up the tent will fall off." Students attending classes in tents Zhang Shuai said. In this environment of teaching, teachers also expressed concern about the robustness of the tent. "Students in this age group is very naughty, if it was steel, fearing that they will be injured." Teach language Ding also said that once the wind and rain and snow,http://www.slotorsre.fora.pl/index.php?item/create_form/1, the student body can not stand.
& Gt; & gt,louboutin; & gt,air max pas cher,http://www.sczx188.com/forum.php?mod=forumdisplay&fid=38&filter=typeid&typeid=15; school explained
Tent is actually quite upset
The school is how to treat this matter it? Yesterday afternoon,moncler milano outlet, Chu village primary school presented to reporters a year in September "Application Report."
Report, Chu village primary school in October 2010 started a real  project,moncler outlet, the original school buildings demolished, the school can not meet the needs of teaching spare room, had temporarily rented house Chu Zhuang station when smoke classroom. According to the construction contract signed between the school and the construction side, the construction side should be on June 1,http://www.qusaoba.net/phpwind/read.php?tid=358387&ds=1,hogan outlet sito ufficiale, 2011 to ensure that the reconstruction project is completed, no later than August 20 delivered to September 1 school use. Because construction is slow, and often in shutdown state, school teachers and students can not return to school as scheduled,woolrich donna, with the school rented housing Chu Zhuang station smoke also because there are security risks does not work properly, the? Bridge district Fuli school research center decided Chu Village Elementary School staff and students have to move back.
The report also said, unable to find a suitable house to rent in school, in order not to affect the school, the school in desperation reported to higher authorities agreed to maintain teaching in primary schools only six Class B dangerous, half-day teaching practice (a grade three, five morning classes, grades two,chaussures nike tn, four, six afternoon classes). In this regard, teachers and students, parents views are great. In order not to affect the normal teaching, if you let the students all day, there must be some students open-air school. Lasted nearly a month later, the school and parents and Chu village built jointly funded three plastic tent used as temporary classrooms.
& Gt; & gt; & gt; department statement
Ensure completion next month use
So, education authorities have any argument? Yesterday afternoon? Bridge District Secretary for Education, Zhu Yong told reporters, Chu village primary school safety project is Lingbi Construction and Installation Engineering Co., Ltd. to build new construction, and because the company failed to pay wages in a timely manner during construction,moncler uomo, workers repeatedly report ,? bridge district labor security supervision brigade also made repeated trips to the investigation. Construction side fails due to funding issues agreed period of completion, resulting in the school was unable to move into the new building. ? Bridge District School Board several times from the beginning of August to find the construction side, but the problem has not been solved delay.
Mr Chu introduced,http://www.middlewareforums.com/viewtopic.php?pid=410785#p410785, in order to promote the construction of school safety project,? Bridge District Board of Education was in October Suzhou Municipal Construction Committee to tender to do,http://image.letuijian.com/forum.php?mod=viewthread&tid=1342012&extra=,? Bridge District Construction Bureau issued a "lag enterprise qualification tender for the cancellation of school safety project progress The report, "The report contains eight failed to complete the construction tasks as agreed period of construction companies were included in the" blacklist ", including Lingbi Jianxin Construction and Installation Engineering Co., Ltd..
Chu village primary school lag issue for security projects,? Bridge District School Board was November 17 will be subcontracted to another company engineering and construction units have qualified for construction, ensure that the entire project be completed in early December, when the school teachers and students to moved into the new building. For Lingbi Jianxin Construction and Installation Engineering Co., because they can not affect the performance of the contract regarding the construction of school safety project, Mr Chu said it would take legal action.
Our reporter Zhang Tao photo coverage
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

j關於我們
尚未設置

Archiver|手机版|小黑屋|一起主機網  

Copyright 2013 最新最精彩-社区论坛 版权所有 All Rights Reserved.

Powered by Discuz! X3.1

© 2001-2013 Comsenz Inc.

快速回复 返回顶部 返回列表